Gapkontroll mellan fiskplatta och järnväg och dess påverkan på prestanda

Jul 22, 2025 Lämna ett meddelande

Gapkontroll mellan fiskplatta och järnväg och dess påverkan på prestanda

 

  • Vilka är de typer av luckor mellan fiskplattor och skenor, och vilka standardkrav?

Longitudinal gaps (along the length of the rail) are the main type, with a standard requirement of ≤0.3mm. Excessively large gaps (>0.5mm) will cause impact when the train passes, increasing the vibration acceleration by 20% - 30%. Ordinary railways allow slightly larger gaps (≤0.5mm), and high - speed railways strictly control them to ≤0.2mm. Lateral gaps (perpendicular to the length of the rail) must be ≤0.2mm. Exceeding 0.3mm will make the fishplate stress uneven, with a bolt preload deviation of 15% - 20%. Lateral gaps in curve sections are controlled more strictly (≤0.1mm) to resist lateral forces. Vertical gaps (between the rail head and the top of the fishplate) should be ≤0.3mm. Excessively large gaps (>0 . 5mm) kommer att göra att skenan hoppar upp och ner under belastning, och accelererar fiskplattans slitage . tunga - Trafik Järnvägar måste styra dem till mindre än eller lika med 0 . 2mm för att säkerställa stabil belastningsöverföring. Standarden för Bolt Hole -luckor (mellan bultar och hål) är 0.2 - 0.4 mm. För små luckor (<0.1mm) make installation difficult, and too large gaps (>0 . 5mm) kommer att göra att bultar har ytterligare böjmoment, vilket minskar livslängden . Klyftan måste kontrolleras exakt för att matcha bultdiametern.

 

fishplate in daily life

 

  • Vilken inverkan har alltför stora luckor på utförandet av fiskplattor och skenor?

Excessively large longitudinal gaps create steps at rail joints, increasing the impact force when wheels pass by 30% - 50%. The fatigue life of fishplates and rails is shortened by 40% - 60%. This problem is more serious in heavy - haul railways and may lead to rail fracture at joints. Excessively large lateral gaps will deform fishplates under lateral forces, increasing the bolt loosening rate by 2 - 3 times, with gauge deviation exceeding ±1mm, requiring frequent adjustment and increasing maintenance costs. Excessively large vertical gaps will reduce the contact area between rails and fishplates by 10% - 15%, increase local pressure, and cause plastic deformation on the rail bottom and fishplate surface, with dents (depth >0.5mm), affecting connection strength. Uneven gaps (with differences >0 . 3mm i olika delar) kommer att obalansera stressen på fiskplattor, med en stresskoncentrationsfaktor på 1.5 - 2.0, benägna att spricka . slipning behövs för att säkerställa enhetliga luckor med en avvikelse mindre än eller lika med 0,2 mm.

 

bs-80r-railway-fishplate4d897

 

  • Hur mäter jag klyftan mellan fiskplattor och skenor?

Feeler gauge measurement is a common method. Use feeler gauges of 0.02 - 1mm to measure different parts (longitudinal, lateral, vertical) between fishplates and rails, measure 3 points at each part, and take the maximum value. Ordinary railways can sample (5 points per kilometer), high - speed railways need 100% detection. Dial indicator measurement has higher accuracy. Fix the gauge base on the rail, touch the feeler gauge to the fishplate, and read the gap value with an accuracy of ±0.01mm, suitable for key parts such as turnout areas to ensure the gap<=0.1mm. Laser gap meters are used for batch detection, measuring gaps through laser scanning, with data transmitted to the terminal in real time, which can quickly judge whether the gap is qualified. The detection efficiency is 5 - 10 times that of feeler gauges, suitable for large - scale laying. After installation, indirectly judge through train vibration tests. Om vibrationsaccelerationen vid fogen är 20% högre än den i andra delar, kan det vara så att gapet är för stort och riktad mätning och justering behövs.

 

fish plate application

 

  • Vilka är de specifika åtgärderna för att kontrollera klyftan mellan fiskplattor och skenor?

Precisely grind the contact surfaces of rails and fishplates to make the surface roughness Ra<=3.2μm and flatness deviation<=0.1mm/m. After grinding, the gap can be reduced by 30% - 40%. High - speed railway joints must adopt this method to ensure that the gap meets the standard. Select high - precision fishplates (hole position deviation<=0.3mm), with a fitting gap 20% - 30% smaller than that of ordinary fishplates. Although the cost increases by 10% - 15%, it can maintain small gaps for a long time, and heavy - haul railways prefer this method. Tighten bolts in a symmetrical order during installation: first pre - tighten diagonal bolts (50% torque), then tighten other bolts to the specified torque in turn to make the gap evenly distributed with a deviation<=0.2mm, avoiding excessive unilateral gaps. Fyll gapet med tätningsmaterial (såsom högkilotisk gele med hög temperatur) med en tjocklek av 0.2 - 0.3 mm. Efter härdning kan det eliminera 50% - 60% av små luckor och förhindra att regnvatten och skräp kommer in. Kustområden måste anta denna åtgärd för att minska gapskorrosion.

 

  • Vilka är skillnaderna i gapkontroll och underhållsåtgärder mellan olika järnvägstyper?

High - speed railways have the strictest gap requirements (longitudinal<=0.2mm, lateral<=0.1mm), using high - precision fishplates and numerical control grinding, detecting gaps every six months, and dealing with exceeding gaps immediately to ensure stable train operation (vibration acceleration<=30m/s²) . tunga - dra järnvägar fokusera på att kontrollera longitudinella och vertikala luckor (både mindre än eller lika med 0 . 2mm), med förtjockade fiskplattor (2 mm tjockare än vanliga) för att förbättra deformationsresistens, ersätta tätningsmaterial varje 2 år för att förhindra gapskormer från att utöka. Vanliga järnvägar tillåter något större luckor (längsgående mindre än eller lika med 0,5 mm), anta ekonomiskt underhåll, upptäcka en gång om året, slipa och justera när luckorna överstiger standarden utan ofta komponentersättning, balanseringskostnader och prestanda. På grund av ofta start - stopp av stads järnvägstransport förändras luckorna snabbt, med inspektioner en gång om året, med fokus på gemensamma luckor inom 200 m i båda ändarna av stationen och snabb hantering av överskridande delar för att undvika överdriven vibrationer som påverkar passagerarkomforten.